San Francisco, CA
Located in the SOMA district of San Francisco, on 6th Street and Folsom, we were approached to create a design that maximized the potential of the small site, 25’ x 80’, in order to replace the existing two-story. Per planning and zoning requirements, we designed a new multi-use six story structure that steps back from the street.
In collaboration with
San Francisco, CA
Kuth Ranieri teamed with Gensler on the design for the 1.1 million square-foot SFO Terminal 1 Center Renovation Project. Through design-build delivery with Hensel Phelps, the new terminal redeveloped one of the Airport’s oldest terminals to meet the needs of modern travelers and revolutionize the guest experience.
A Gensler / Kuth Ranieri Architects Joint Venture
San Francisco, CA
One of a number of “Enabling Projects” as part of the T1C Renovation, the project renovated a former Chinese restaurant, bordered on one side by an existing TSA security barrier. The design creates a “Pop Up” feeling to reflect the two year life span.
In Joint Venture with Gensler
Sunnyvale, CA
San Francisco’s first LEED Silver certified dental office, the 2,400-square-foot suite creates an inviting presence for passersby, emphasizing the visual impact of the reception “living room.”
Napa Valley, CA
Echoing the evident assembly of the historic stone shell, the walls are designed to portray their essential construction, a resonance between old and new.
In collaboration with Jim Jennings Architecture